An official website of the European Union How do you know?      
European Commission logo
JRC Publications Repository Menu

What results should Flexibility Needs Assessments in the power sector produce?

cover
Output indicators that meet the objectives of the Electricity Market Design reform
The recently adopted Electricity Market Design (EMD) reform includes provisions for the creation of Flexibility Needs Assessments (FNAs) on the national and European level. The reform sets a focus on advancing decarbonization while maintaining a high level of supply security. The FNAs should further enable Member States to set up mechanisms to procure additional flexibility to meet any identified inefficiencies due to an insufficiently inflexible the system. Against this background, the JRC reviewed existing flexibility assessments in the literature based on what outcomes they produce. Based on this review, we propose that FNAs in Europe should assess three key areas: renewable integration, ramping needs and reserve requirements. We further propose concrete indicators, which allow to derive net flexibility needs – taking into consideration the capabilities already present in the system – and enable Member States to procure any missing volumes of flexibility.
2024-09-02
Publications Office of the European Union
JRC139027
978-92-68-20978-3 (online),   
1831-9424 (online),   
EUR 40070,    OP KJ-01-24-074-EN-N (online),   
https://publications.jrc.ec.europa.eu/repository/handle/JRC139027,   
10.2760/9174552 (online),   
Language Citation
NameCountryCityType
Datasets
IDTitlePublic URL
Dataset collections
IDAcronymTitlePublic URL
Scripts / source codes
DescriptionPublic URL
Additional supporting files
File nameDescriptionFile type 
Show metadata record  Copy citation url to clipboard  Download BibTeX
Items published in the JRC Publications Repository are protected by copyright, with all rights reserved, unless otherwise indicated. Additional information: https://ec.europa.eu/info/legal-notice_en#copyright-notice