The work reported is a deliverable within the framework of the Administrative Arrangement between DG ENTR and JRC on support to the implementation, harmonization and further development of the Eurocodes. The report encompasses the results achieved during the three-year work on Sub-task 5.2 'Needs for fire protection' of the Administrative Arrangement with DG ENTR.
The report consists of three self-contained sections, namely:
- Research needs to achieve improved fire design using the Eurocodes,
- Implementation and use of fire-parts of the Eurocodes, and
- Survey on the progress in the National implementation of the Eurocodes fire design parts.
The present report has been prepared by the JRC in collaboration with the two ad-hoc groups on fire design convened by the JRC and in consultation with DG ENTR, Member States and individual experts and organizations involved in fire design.
KRUPPA J.;
SEDLACEK G.;
HEINEMEYER C.;
DIMOVA Silvia;
PINTO VIEIRA Artur;
OZTAS A.;
2008-10-07
OPOCE
JRC47512
1018-5593,
EUR 23523 EN,
https://publications.jrc.ec.europa.eu/repository/handle/JRC47512,
| Name | Country | City | Type |
|---|
This document is only visible at the Commission level.
You are not authorized to publish or distribute it outside the European Commission.
This is a public document. You can share this publication.
Datasets
| ID | Title | Public URL |
|---|
Dataset collections
| ID | Acronym | Title | Public URL |
|---|
Scripts / source codes
| Description | Public URL |
|---|
Additional supporting files
| File name | Description | File type |
|---|