VARIABLES CONSIDERED BY THE PISC GROUP FOR THE EVALUATION OF THE RRT RESULTS ARE DISCUSSED. DATA STORAGE, DATA CLEANING, AND COMPUTER CODES ARE DESCRIBED. RESULTS ARE EXPRESSED FOR THE DIFFERENT TEST ASSEMBLIES AT DIFFERENT LEVELS 1. CONSIDERING FULL PROCEDURES RESULTS (E.G. ASME TYPE PROCEDURES WITH 20% DAC CUT-OFF) 2. CONSIDERING PROCEDURES RESULTS AS A FUNCTION OF SEVERAL PARAMETERS INCLU- DING CUT-OFF LEVEL, DEFECT POSITION, DEFECT SIZE, DEFECT CHARACTERISTICS, AND UNCERTAINITY ON DEFECT SIZE, AND 3. CONSIDERING TECHNIQUES (COMPONENTS OF PROCEDURES) RESULTS AS A FUNCTION OF THEPARAMETERS ABOVE.
CRUTZEN Serge;
VINCHE Claude;
HAINES N.;
1995-03-15
JRC5072
https://publications.jrc.ec.europa.eu/repository/handle/JRC5072,
| Name | Country | City | Type |
|---|
This document is only visible at the Commission level.
You are not authorized to publish or distribute it outside the European Commission.
This is a public document. You can share this publication.
Datasets
| ID | Title | Public URL |
|---|
Dataset collections
| ID | Acronym | Title | Public URL |
|---|
Scripts / source codes
| Description | Public URL |
|---|
Additional supporting files
| File name | Description | File type |
|---|