Annual Report 2008 - Operation and Utilisation of the High Flux Reactor
The High Flux Reactor (HFR) at Petten is managed by the Institute for Energy (IE) of the EC - DG JRC and operated by NRG who are also licence holder and responsible for commercial activities. The HFR operates at 45 MW and is of the tank-in-pool type, light water cooled and moderated. It is one of the most powerful multi-purpose materials testing reactors in the world and one of the world leaders in target irradiation for the production of medical radioisotopes.
MAY Roberto;
MOSS Raymond;
GOUWENS Gerda;
2009-07-27
European Commission
JRC52541
978-92-79-12986-5,
1018-5593 / 1830-5997,
EUR 23952 EN,
OP LD-NA-23952-EN-C,
https://publications.jrc.ec.europa.eu/repository/handle/JRC52541,
10.2790/12971,
Additional supporting files
| File name | Description | File type | |