An official website of the European Union How do you know?      
European Commission logo
JRC Publications Repository Menu

Handbook of Tsunami Evacuation Planning - SCHEMA (Scenarios for Hazard-induced Emergencies Management), Project n° 030963, Specific Targeted Research Project, Space Priority

cover
This handbook is dedicated to provide thorough and hands-on information in order to produce fully-comprehensive methodology of tsunami evacuation plan generation. Hence community-employed decision makers or similar stakeholders are supplied with a detailed guideline to implement a fully-fledged evacuation plan within three stages : set-up of valid first instance of evacuation plan, mid-term revision, and long-term revision and integration. Local tsunami risk assessment and all subsequent implications on evacuation planning are based on (1) knowing the to-be-expected tsunami wave height, and (2) the to-be-expected arrival time of the first devastating tsunami wave. The first parameter helps to calculate the area at risk ; the second parameter gives an indication of how fast the evacuation has to take place. Consequently, the evacuation plan instance must guarantee that a certain number of affected persons has to be brought onto safe areas within a given time limit. Safe areas (shelters) are higher located places, either on natural ground, or on artificially built-up constructions including building higher than three stores. Evacuation has to take place on a given network of suitable roads or paths. In this context, if necessary, the methodology foresees also the inclusion of additionally to be built escape routes and/or safe places in order to produce a fully working evacuation plan that fulfills the basic requirements. The methodology also explains how to implement a valid instance of evacuation plan by marking the identified escape routes and shelters in reality, and how to disseminate all information to the affected population. Within a mid-term review the evacuation plan has to be maintained constantly and appropriate authority-own measures have to be guaranteed. The long-term review, finally, keeps track of all other information needed to run the evacuation plan properly : integration with early-warning systems, integration with other emergency plans, checking of legal obligations. In addition, the whole evacuation plan must be reviewed together with the affected population and a maximum of acceptance be obtained. In this contaxt, and if necessary, adaptations should be made in order to guarantee the well-functioning of the whole plan within its best performance.
2011-03-04
Publications Office of the European Union
JRC61202
978-92-79-19086-5,   
1018-5593,   
EUR 24707 EN,    OP LB-NA-24707-EN-C,   
https://publications.jrc.ec.europa.eu/repository/handle/JRC61202,   
10.2788/34292,   
Language Citation
NameCountryCityType
Datasets
IDTitlePublic URL
Dataset collections
IDAcronymTitlePublic URL
Scripts / source codes
DescriptionPublic URL
Additional supporting files
File nameDescriptionFile type 
Show metadata record  Copy citation url to clipboard  Download BibTeX
Items published in the JRC Publications Repository are protected by copyright, with all rights reserved, unless otherwise indicated. Additional information: https://ec.europa.eu/info/legal-notice_en#copyright-notice