The goal of the CCRI(II) "Realisation of the becquerel" project is to design a reproducible radioactivity standard which will increase the robustness of the current international reference system for radioactivity measurements. Tests performed with a first prototype ionisation chamber of this project, built in 2005, are presented. Based on experience with the first prototype, a new design was proposed in 2010 aiming at achieving the very ambitious project goals. The article discusses the status of the project and the advantages of the new design.
SULIMAN Gabriel;
PAEPEN Jan;
WAETJEN Uwe;
2014-04-16
PERGAMON-ELSEVIER SCIENCE LTD
JRC82731
0969-8043,
http://dx.doi.org/10.1016/j.apradiso.2013.11.130,
https://publications.jrc.ec.europa.eu/repository/handle/JRC82731,
10.1016/j.apradiso.2013.11.130,
| Name | Country | City | Type |
|---|
This document is only visible at the Commission level.
You are not authorized to publish or distribute it outside the European Commission.
This is a public document. You can share this publication.
Datasets
| ID | Title | Public URL |
|---|
Dataset collections
| ID | Acronym | Title | Public URL |
|---|
Scripts / source codes
| Description | Public URL |
|---|
Additional supporting files
| File name | Description | File type |
|---|